Most Cebu homes go from first message to a running solar and battery system in a few weeks. Our team completes the roof and electrical work in two to four days, with power only turned off briefly during final breaker tie-in.
- 1 day to your personalized quote
- 2–4 days on-site crew install
- 48 hrs our Metro Cebu response aim

The four stages
What happens, when it happens, and what you get
Every project follows one engineering checklist from our Cebu City office.
Within 1 business day
Your personalized quote
Send your bill, roof type and a map pin. We map your roof by satellite and message your quote: panels, battery, monthly savings, payback and price.
When you’re ready
Site check & fixed price
We inspect rafters or purlins, measure tree or neighbor shade, check main breaker ratings and pick a shaded wall for your inverter and battery. Our system designers then send one fixed price listing every panel, breaker and meter of cable.
2–4 days on-site
Crew installation & switch-on
Our installers mount the 240 km/h rail frame, route UV-rated conduit, wire the Schneider and Suntree protection bay, test anti-islanding and backup transfer, and switch you on.
Month 1 & beyond
App handover, permits & check-up
We set up live Solis phone monitoring, run a 30-day remote health check, and in Metro Cebu we aim to reach you within 48 hours.
Inside those 2 to 4 install days
Clean roof work. Labeled switchboards. Minimal disruption.
Your household does not sit in the dark for three days while we work. Only the final main-panel tie-in requires a short, scheduled 30 to 60 minute power pause.
- Day 1 (Roof structure): L-feet or stainless tile hooks are bolted into steel C-purlins or concrete rafters on the raised roof ridges, sealed with EPDM gaskets and polyurethane sealant, then leveled with anodized aluminum rails.
- Day 2 (Panels & conduit): 620 W bifacial modules are torqued down with mid and end clamps, grounded, and wired in UV-stabilized conduit down to the inverter bay.
- Day 3 (Inverter, battery & commissioning): Solis inverter, Dyness or Pylontech LiFePO4 battery, DC isolators, surge arresters and labeled AC breakers are terminated, megger-tested, and demonstrated under a live simulated brownout.

What we need from you to move fast
You do not need technical solar knowledge. Having these five items ready keeps your schedule tight:
- Photos of two or three recent VECO, MECO or CEBECO bills showing monthly kWh
- Subdivision gate pass or building admin clearance if you live in a gated village
- Access to your ceiling hatch, roof and main breaker board on site-visit day
- Sign-off on the itemized fixed quote and the 40% equipment order stage
- An adult at home during installation days and 30 minutes at handover for app setup
Solar only vs. solar + battery vs. diesel generator
| What you get | Grid-Tied Solar Only | Hybrid Solar + Battery | Standby Diesel Generator |
|---|---|---|---|
| Cuts your monthly bill by | 55–75% (daytime loads) | 65–85% (daytime + stored night power) | 0% (adds fuel & oil cost) |
| Works during a brownout? | No, shuts down for lineman safety | Yes, switches in under 10 ms | After 15–45 s transfer or manual pull-start |
| Routine upkeep | Rinse panels 2–4 times a year | Same; LiFePO4 battery is maintenance-free | Diesel refills, oil, filters, starter batteries |
| Noise & exhaust | Silent, zero fumes | Near-silent, zero fumes | Loud engine noise & exhaust smoke |
| Subdivision friendly? | Yes | Yes, silent through overnight outages | Often restricted after 10 PM |
Installation & permitting FAQ
When do my solar panels start saving money?
Right away. The afternoon our crew finishes commissioning, your system begins powering your home and charging your battery, with a smart CT export limiter preventing power from flowing back to the grid.
Do gated Cebu subdivisions like Maria Luisa, Beverly Hills or North Town Homes require HOA permits?
Most subdivisions ask for a roof layout drawing, single-line diagram, contractor accreditation and worker ID list before issuing gate passes. Our Cebu City office helps you prepare that HOA submission pack at no extra charge.
What happens if heavy rain arrives in the middle of my installation?
Crew safety and roof watertightness come first. We never leave unsealed roof penetrations open; every bracket drilled is gasket-sealed the same hour, and roof work pauses during lightning or slick downpours while indoor switchboard wiring continues safely under cover.
What documents do I receive at handover?
You receive your as-built electrical single-line diagram, panel string map, serial-number register, CebuSolar 5-year workmanship certificate, manufacturer warranty sheets for your panels, Solis inverter and LiFePO4 battery, plus owner login credentials on the monitoring app.
Installation, weather and care: what else should you read?
How Long Do Solar Panels Last in Cebu?
Tier-1 panels carry a 30-year output warranty (at least 87% at year 30); Solis inverters 12 years. What salt air and heat do in Cebu, and how to make it last.
Can Solar Panels Survive a Cebu Typhoon?
Yes, if they are mounted right: rails rated for 240 km/h winds, stainless bolts into inspected purlins and sealed roof points. Here is how we do it in Cebu.
Solar Panel Maintenance in Cebu
Keep your solar making power in Cebu: when to rinse panels, salt-air care, what to check in the Solis app and what the 5/12/30-yr warranties cover.
Cebu Peak Sun Hours
Cebu gets about 4.6 peak sun hours a day. See what that means per kW, how Habagat and Amihan change output, and what each 6–18 kW package makes a month.
Brownout Solutions in Cebu
Stop losing work, stock and sleep to Cebu brownouts. LiFePO4 hybrid solar switches on automatically for homes, offices, clinics and cold rooms.
Solar FAQ Cebu
Straight answers to what Cebu homes and businesses ask about solar: 2026 package prices, brownout backup, batteries, typhoons, roofs and warranties.
Get your personalized solar quote
Tell us about your place, pin it on the map and add a photo of your bill. Our team replies on Viber within one business day.
- 1. We size your system from your bill and map your roof by satellite.
- 2. You get your quote: panels, battery, monthly savings, payback and price.
- 3. Happy with it? We check your roof and wiring on site, then lock in one fixed price.